Project Details: Installed new engineered siphonic drainage system. Installed new conventional overflow drains with piping and replaced existing primary drains.
Burton Center
Project Details: Installed new cast iron overflow roof drains with new cast iron piping, routed to exterior wall, discharged into…
Costco Bathroom Remodel
Project Details: Removed and replaced water closets and carriers. Adjusted carrier to conform to ADA water closet height codes. Installed…
Dan Allen Parking Deck
Project Details: Installed parking deck drains, cast iron piping, and connected to the existing storm lines.
McDowell Water Treatment Plant
Project Details: Installed new cast iron piping and PVC piping.
NTPU Naval Base
Project Details: Installed galvanized steel piping for new downspouts.
South Johnston High School
Project Details: Installed underground storm drainage lines to existing catch basins. Installed new catch basins for subgrade drain lines. Graded…